{{ variable.name }}
This 25m³ self-propelled grab dredger, completed in 2012 and classed by ZC, is designed for efficient removal of hard clay and soft sediment in near-shore operations. Built with a steel hull and powered by two Weichai X6170ZC-21 main engines, it delivers reliable performance for coastal dredging projects.
| Year of Completion | 2012 |
| Overall Length | 58.00 m |
| Length Waterline | 58.00 m |
| Length Between Perpendiculars | 56.30 m |
| Molded Breadth | 22.60 m |
| Molded Depth | 4.80 m |
| Designed Draft | 3.00 m |
| Deck Camber | 0.30 m |
| Navigation Area | Coastal |
| Crew | 10 persons |
| Frame Spacing | 0.60 m |
| Grab Capacity | 25 m³ |
| Designed Displacement | 3651.308 t |
| Generators | SB-HW4 × 2 |
| Gross Tonnage | 2349 T |
| Net Tonnage | 705 T |
| Main Engine Model | Weichai X6170ZC-21 |
| Quantity of Main Engines | 2 units |
| Rated Power | 456 KW |
| Rated Speed | 1500 r/min |
| Reduction Gear Box Model | HCD400A |
| Reduction Ratio | 5:1 |
This is a self-propelled grab dredger with 25m³ capacity. Yanyang Marine also offers other grab dredger configurations (e.g., 13m, 15m, 18m, 20m, 50m lengths) based on different project requirements. Contact us for customized solutions.
The hull is constructed from steel, with frame spacing of 0.60 m. The deck camber is 0.30 m, providing structural strength and water drainage.
This grab dredger is suitable for near-shore coastal operations, including port construction, channel deepening, and removal of hard clay and soft sediment. Its self-propelled design enhances maneuverability and reduces reliance on tugs.
Yanyang Marine offers fully customized grab dredgers tailored to specific dredging depth, capacity, classification society, and auxiliary equipment. Options include different grab sizes, engine brands, and automation systems.
Q: What is the classification of this dredger?
A: This vessel is ZC-classed, suitable for coastal navigation.
Q: Can it be re-classed to other societies like CCS or BV?
A: Yanyang Marine can build new vessels to CCS, BV, LR, DNV, or other IACS standards. For this existing unit, re-classification may be possible upon request.
Q: What is the delivery time for a similar new vessel?
A: Standard grab dredger newbuilding typically takes 2–3 months; customized vessels 8–12 months.
Q: What after-sales services do you offer?
A: We provide global commissioning, operator training, spare parts supply, and long-term technical support.
Q: Can the grab capacity be increased or modified?
A: Yes, we offer customized grab sizes and bucket designs to match specific material types, such as hard clay or soft sediment.
Q: Is the vessel available for inspection?
A: Yes, the vessel can be inspected at our shipyard in Zhenjiang, China. Please contact us to schedule a visit.
For pricing, availability, or further technical details, please contact:
Name: Liao
Email: Info@yanyangmarine.com
Tel: +86 159-5290-0547
WhatsApp: +86-159-5290-0547
Suggested filename: yanyang-25m3-self-propelled-grab-dredger-side.png
Alt: Yanyang Marine 25m³ Self-Propelled Grab Dredger - Side View